National News

Between heavy rainfall and weak roads: Tangier region mobilizes machinery ahead of winter

Infrastructure rehabilitation in the Tangier region: Official mobilization following resident complaints

In recent weeks, the provinces of the Tangier-Tetouan-Al Hoceima region have witnessed a wave of criticism from road users and local residents over the deteriorated state of several road networks heavily affected by rainfall. These criticisms, voiced on social media platforms and by local community figures, targeted the Ministry of Equipment and Water and elected councils, demanding an end to the issues hindering daily traffic flow.

Regional Directorate of Equipment: Explanations and repair commitments

In the first official response to these pressures, Ali Hamimou, Regional Director of Equipment in the Tangier-Tetouan-Al Hoceima region, confirmed that the ministry’s departments have mobilized to schedule the necessary repairs. The regional official explained in a statement that technical studies concerning the road networks damaged during the previous floods have been completed, emphasizing that public tenders for these works will launch before the end of next December.

Technical challenges behind delayed works

Responding to inquiries about the causes of the delay, Hamimou pointed out that the scale of damage to some roads, including landslides and soil erosion, necessitated precise studies and specialized soil analyses. The goal of these studies, according to the same source, is to guarantee the quality of the work and prevent recurrence of damages in the future should the region experience similar rainfall. The Regional Director confirmed that approximately 300 damaged points across the region will undergo maintenance, including 32 points that experienced complete traffic disruption during the past floods, with a deadline not exceeding three months to complete the works once contracts are awarded to specialized companies.

Preparing for the winter season: Precautionary measures

On another note, the regional official reported that the directorate has increased its readiness to face upcoming weather fluctuations, particularly in areas experiencing snowfall, such as the provinces of Chefchaouen and Al Hoceima. The necessary logistics have been mobilized, and specialized machinery has been prepared to clear roads in these isolated areas, parallel to testing equipment readiness in the region’s other provinces. Hamimou concluded his statement by emphasizing that the experience of the winter 2026 floods served as a lesson from which the directorate realized the necessity of proactive preparation for the pressure that harsh weather conditions might impose in the near future.

Related Articles

💬 Share your opinion

We welcome constructive opinions and ask you to maintain politeness.

0 comments

Leave a Comment

Back to top button